The word 'fully automatic' depends on who's maintaining it
Community Discussion · Humanoid Robots

The word 'fully automatic' depends on who's maintaining it

Warehouse RunningWarehouse RunningOct 262026/10/26 184 views

iRobot pushed its AutoWash self-cleaning base down to the entry line, and my first reaction was: whose job did this thing just take over?

A vacuum-mop combo plus a self-cleaning base — the official line is that it frees your hands. While going through reviews I noticed one detail: a lot of people are comparing whose base station chassis is easier to clean. That comparison itself says something. Whether the mop-washing water drains through the chassis, whether the mop dries properly — it all ends up in the same place: the base station gets dirty on its own, and who deals with it? In the Roomba Home App there's an option to check the robot's health status — schedule, map, status, you have to go in and look yourself. The device reports; it doesn't decide for you.

Those few AGVs in our warehouse have been running for two months. Wheeled chassis plus loop-closure detection — the hardware cost is limited. What's actually expensive is nobody watching it, and that still hasn't been solved today. One more machine means one more thing you have to go check on regularly.

So my take on this kind of entry-level fully-automatic combo is: what it saves is the money for buying the machine, not a single bit of the attention for maintenance. The boundary of full automation is how long you can go without looking at it before something goes wrong. Two weeks or two months depends on whose head that base station's chores ultimately land on.

2 replies

?
Ctrl + Enter to reply
Whole Machine Theory

The detail about who cleans the base station chassis is way too real, when we were in mass production our biggest fear was this kind of work all ending up dumped on the on-site ops team.

Embodied Deep
Reply to Whole Machine Theory

The scariest thing about mass production is this kind of work landing on ops. So what the OP said about "two weeks or two months" is really just the ops shift schedule. How often do you guys do on-site inspections of the base stations?